티켓 #20034 (new 해야할 일)

작성된 시간 : 1 주 전

The Railway Technical Website

작성자: Essie776646678 담당자: somebody
Priority: 사소한 Milestone: 마일스톤3
Component: 콤포넌트2 Version: 1.0
Keywords: about about about Cc:

상세한 설명

<br> A practice moving at pace with its pantograph hooked over the wire can carry down several kilometres of line before it's detected and the prepare stopped (Figure 12). The most refined pantographs have horns which are designed to break off when struck exhausting, for instance, internet by a dropper or catenary assist arm. The wire is zigzagged relative to the centre line of the track to even the put on on the prepare's pantograph because it runs underneath. The weights and pulley system is designed to maintain contact wire tension. The tension of the wire is maintained by weights suspended at each end of its size. The wire have to be able to hold the present (several thousand amps), stay according to the route, withstand wind (in Hong Kong typhoon winds can attain 200 km/h), extreme cold and heat and different hostile weather circumstances. DC overhead wires are usually thicker and, in excessive load circumstances, double wires are used, as in Hong Kong Mass Transit’s 1500 v DC supply system. Alternatively, some people consider the overhead catenary system a visual intrusion. Overhead traces are normally fed in sections like 3rd rail methods, but AC overhead sections are usually much longer.<br>

<br>blackhatworld.com In cities similar to London, New York City and Boston, the same trains run beneath overhead wires for part of the journey and use third rail for the remainder. Careful preparation of earthing safety in constructions and tunnels is an essential a part of the railway design process and is uncared for at one’s peril. However, it was additionally used on plenty of most important line railway systems, and nonetheless is in some components of continental Europe, for example. Generally, it’s a query of what form of railway you might have. We've got already talked about the issue (above) of a wave being formed within the wire by a pantograph moving at high speed. Originally, pantographs had been simply that, a diamond-formed "pantograph" with the contact head at the top. To achieve this, the provision sub-station transformer is provided with a centre faucet secondary winding at 50 kV (set to fifty five kV for the maximum restrict of contact wire voltage of 27.5 kV).<br>

<br> Figure 7: Overhead contact wire displaying the grooves added to provide for the dropper clips. Each subsection is remoted from its neighbour by a section insulator in the overhead contact as proven on this image beneath. They are related to the feeder station by a return conductor cable hung from the masts so that it is roughly the same distance from the monitor because the overhead line. These are positioned on masts at intervals along the route. It additionally implies that, if trains are stopped and should be evacuated, the present must be turned off before passengers may be allowed to wander the observe. Various forms of catenary suspension are used depending on the system, its age, its location and the speed of trains using it. In effect, it is predicated on distributing energy at 50 kV AC however feeding the power to the trains at 25 kV AC.<br>

<br> The mechanics of power provide wiring just isn't as simple as it seems to be (Figure 1). Hanging a wire over the monitor, providing it with current and working trains beneath it isn't that easy whether it is to do the job properly and final lengthy sufficient to justify the expense of installing it. Broadly speaking, the upper speeds, the more advanced the "stitching", although a easy catenary will normally suffice if the support posts are shut enough together on a high pace route. It is simpler to spice up the voltage of AC than that of DC, so it is easier to ship more power over transmission strains with AC. However, the choice of AC or DC power transmission system along the line is vital. In fact, it needed a heavier transmission medium, a 3rd rail or a thick wire, to carry the power and it misplaced a good quantity of voltage as the space between provide connections increased.<br>

첨부파일들


티켓 #20034 에 대해 내용을 추가 및 변경하기
(The Railway Technical Website)




티켓에 대한 정보
티켓에 대한 동작