티켓 #6031 (new 개선사항)

작성된 시간 : 2 달 전

The Railway Technical Website

작성자: GretaHux240131 담당자: somebody
Priority: 매우 사소한 Milestone: 마일스톤1
Component: 콤포넌트2 Version: 2.0
Keywords: what is electric cable what is electric cable what is electric cable Cc:

상세한 설명

<br> Compressed air pressure is most well-liked for top speed operation. Broadly speaking, the upper speeds, the more complex the "stitching", though a simple catenary will often suffice if the assist posts are close sufficient together on a high pace route. Overhead catenary methods, known as "catenary" from the curve formed by the supporting cable, have a fancy geometry, these days usually designed by pc. Overhead strains are usually fed in sections like third rail systems, but AC overhead sections are normally much longer. When opened, they stop part of the line for being fed by the substation. This is one in all the most common causes of wires "being down". DC overhead wires are normally thicker and, in excessive load instances, double wires are used, as in Hong Kong Mass Transit’s 1500 v DC supply system. The wire have to be ready to carry the present (a number of thousand amps), remain according to the route, withstand wind (in Hong Kong typhoon winds can reach 200 km/h), extreme chilly and heat and other hostile weather circumstances. Nevertheless, some embarrassing incidents in Asia with disintegrating manhole covers close to a metro line as lately as the early 1980s implies that the issue nonetheless exists and isn’t always properly understood.<br>

<br> However, it was also used on quite a few foremost line railway systems, and nonetheless is in some elements of continental Europe, for example. It should be mentioned at this point that corrosion is always an element to be thought of in electric supply methods, what is electric cable significantly DC systems. I haven’t yet mentioned trolley poles as a method of current assortment. These had been used for current collection on low velocity overhead programs and have been widespread on trams or streetcars but they are now obsolete. Incorrect tension, mixed with the fallacious velocity of a prepare, will trigger the pantograph head to begin bouncing. A couple of pantograph on a practice may cause the same drawback when the leading pantograph head units up a wave in the wire and the rear head can’t stay in touch. Some train providers operate over strains using multiple kind of present. Current is collected from overhead lines by pantographs. If a communications cable is laid alongside rails carrying the return current of the overhead line provide, it could have unequal voltages induced in it.<br>

<br> The impact of this association is to cut back the noise levels in the communications cable and make sure the voltages stay at a safe level. On lines equipped with AC overhead wires, particular precautions are taken to scale back interference in communications cables. Of course, as many railways use the running rails for signalling circuits as effectively, particular precautions must be taken to guard them from interference. Figure 9: To cut back the arcing at a impartial section within the overhead catenary, some systems use observe magnets to mechanically switch off the facility on the practice on the approach to the impartial section. A second set of magnets restores the facility immediately after the impartial part has been passed. The tendency of return currents to wander away from the operating rails into the bottom can set up electrolysis with water pipes and comparable metallics. Because the pantograph is usually the only point energy contact for the locomotive or power automotive, it should maintain good contact under all working conditions. The upper the speed, the more difficult the upkeep of excellent contact. A extra environment friendly system of AC electrification is understood because the auto transformer system. It is less complicated to boost the voltage of AC than that of DC, so it is less complicated to ship more energy over transmission traces with AC.<br>

<br> The French TGV (High Speed Train) formation has a power automotive at every end of the train however only runs with one pantograph raised under the excessive velocity 25 kV AC strains. Various forms of catenary suspension are used depending on the system, its age, its location and the speed of trains using it. The wire length is usually between one thousand and 1500 metres long, depending on the temperature ranges. 25 kV and the feeder wire at -25 kV thus the voltage in between these circuits is 50 kV however to ground is 25 kV. The auto transformer system permits substations to be further apart without voltage drop. Figure 11: A schematic displaying the preparations for 25kV AC electrification techniques utilizing booster transformers (upper drawing) and the auto transformer system (decrease drawing). Figure 7: Overhead contact wire exhibiting the grooves added to provide for the dropper clips. These are turned downwards to scale back the chance of the pantograph being hooked over the top of the contact wire as the practice strikes alongside. The wheels, being steel, take it to the operating rails. Figure 12: Russian video of a pantograph being damaged by an overhead wire out of place.<br>

첨부파일들


티켓 #6031 에 대해 내용을 추가 및 변경하기
(The Railway Technical Website)




티켓에 대한 정보
티켓에 대한 동작